T_p = (X/R) / 2πf is derived from these, and T_p is what sets the
transient dimensioning factor a. A placeholder X/R under-sizes the core.
High-speed auto-reclosing (C-O-C-O)Retained flux on the second shot
3CT Nameplate (Vendor Data)
R_ct not available yetVerify against a bound instead of a value
Catalogue ratings (optional) - short-time thermal, dynamic, insulationReal catalogues (ABB TPU/KOFA, GE) print these; the tool did not
collect any of them until now. Ith and Idyn are checked against the system fault
current already entered above - Um and BIL are selection data with no checkable
counterpart in this tool and are carried through to the report only.
Multi-ratio tap derating (optional) - estimate this tap from the full windingIEEE C57.13 publishes the relaying accuracy class for the FULL winding
of a multi-ratio CT. On a lower tap only part of the winding is in use, so R_ct and the
terminal-voltage capability are lower, roughly in proportion to the turns in use. Fill
these in only when you have the full-winding rating and want a reference estimate for
the adopted tap above - the estimate is never used by any criterion, and it assumes a
fully distributed winding, which is an approximation a real winding may not meet.
4Secondary Circuit
Relay and meter burdens are quoted in VA and become ohms at the
rated secondary current - R = P / I_sn². Set contact resistance to 0 to
reproduce a sheet that omits it.Overrides - reproduce an existing calculation sheetEvery field here is derived by default. Fill one in only to
match a legacy sheet; anything overridden is marked as such on the report.
5Distance Protection Data
The Zone 1 reach current and the loop X/R both come out of
Z_T = Z_s + reach × Z_L, so they can never disagree with each other. Enter
the reach current directly below only if the line data is not available.
IEEE C37.110 remanence overrideClass C only - replaces the a/b criteria
5Transformer Data
5Busbar Data
5Restricted Earth Fault Data
5Voltage Transformer Data
Disclaimer and reference standards
Engineering aid - verify before use. Results are not a stamped design.
The engineer of record is responsible for the final selection, and no warranty is expressed
or implied.
VT burden and voltage drop: IEC 61869-3 cl. 5.6.301 / 6.4, IEEE C57.13 cl. 5,
IEEE C57.13.1 cl. 6.2.
Reading the verdict: a criterion reported as not evaluated is not a pass.
Supply the missing data and re-run before relying on the result.
Selection basis: instrument transformer selection is governed by the project
specification, the relay manufacturer's own CT requirement sheet and the certified network
study. Dimensioning factors taken from a manufacturer's application data apply to that
manufacturer's relays. Confirm R_ct, knee-point and excitation data against the vendor's
routine test report before ordering.